Download EV Grant Support Pack (PDF)
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack · 2026/27 Edition

Nexgen Electrical Innovations · OZEV Approved Installer

EV Chargepoint
Grant Support Pack

Everything you need to claim up to 75% back on your commercial EV charging installation — 2026/27 Edition

OZEV Approved Installer
NICEIC Certified
Rolec Accredited
Monta Charging Partner
Scan to open grant guide online
Scan to open online
Rolec EV charger single unit installed at Capitol Building Bracknell — KARIUM bay

nexgen-electrical.co.uk · info@nexgen-electrical.co.uk · 03333 356 037

Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
EV Chargepoint Grant Support Pack · 2026/27 Edition
Table of Contents
Your complete guide to UK government EV charging grants — eligibility, ROI, case study, and everything you need to apply direct to OZEV.
Cover
P1
OZEV Approved Installer · 2026/27 Edition
Contact & QR Code
Why Act Now?
P3
Government Deadline — OZEV Queue Growing
Rising Install Costs — Lock In Today's Rates
Competitor Advantage — 34% Higher Dwell Time
Cost of Delay — £460/month Without Charging
UK Government EV Grants
P4
Grants Comparison Table (WCS / Landlord / Renter)
Which Grant Applies? — Decision Flowchart
Key Grant Facts · Scheme Summary Cards
Workplace Charging Scheme (WCS)
P5
5 Scenario Cards — 2 to 40+ Sockets
Eligibility Checklist — 8 Requirements
Common Mistakes · What Happens After You Apply?
EV Charging for Landlords
P6
Landlord Grant ROI — 4 Scale Scenarios
Tenant Billing · Fuse Board · VAT FAQ
Typical 10-Week Project Timeline
Renters & Flat Owners
P7
Rights Under EV Grant Regulations 2023
6-Step Permission Process
Legal Rights & Tribunal Escalation
Capitol Building Case Study
P8
7 Rolec Chargers · WCS Grant Eligible
EV Installation · LV Infrastructure · Logistics
Full Project Overview Table
How Nexgen Delivers
P9
5-Step Installation Process
Free Survey → Design → Install → Setup → O&M
EICR — UK Law Every 3–5 Years
P10
Pre-Inspection Checklist (8 Items)
Defect Codes C1 / C2 / C3 Reference
Common EICR Mistakes · NICEIC Certified
Why Nexgen Electrical Innovations
P11
Certified & Accredited — OZEV · NICEIC · Rolec · Monta
End-to-End Service · Local Knowledge
South East England & South Wales Specialists
Contact & Book Your Survey
P12
Book a Free Site Survey · Check Eligibility
Call Us: 03333 356 037
The Nexgen Guarantee · 5 Service Areas
All grant links, eligibility checklists, and OZEV portal URLs are provided in this pack — apply direct to OZEV with confidence. · nexgen-electrical.co.uk
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition

Why Act Now?

Government Deadline
Applications surge before year-end. 2,847 businesses already funded. Queue growing.
Q4 2026 confirmed as peak demand — longest processing queues of the year
Budget allocation is finite — OZEV operates first-come, first-served
Jan–Mar 2026 applicants saw 8-week approval delays due to volume
OZEV Processing Timeline — 2026
Q1–Q2 20264–6 weeksNormal
Q3 20266–8 weeksBusy
Q4 20268–12 weeksPeak
Funding Demand2,847 / est. 5,000 slots used
Rising Install Costs
Average install costs have risen 23% since 2022. Lock in today's rates.
Size2022 Cost2026 CostRise
2 sockets£2,400£3,200+33%
5 sockets£4,800£6,500+35%
10 sockets£7,800£11,000+41%
Material & labour costs continue to rise with grid demand
Competitor Advantage
Businesses with EV charging report 34% higher dwell time and repeat visits.
Higher dwell time34%
Increase in repeat visits28%
Annual revenue per charger£2,400
MetricNo EVWith EV
Avg. customer spend£18£24
Return visit rate42%61%
Google rating lift+0.4★
Source: ZapMap Business Survey 2025
Cost of Delay
Every month without charging costs approx. £460 in lost revenue and higher bills.
Lost EV customer revenue~£280/mo
Higher energy costs~£120/mo
Staff home charging subsidy~£60/mo
Total monthly delay cost~£460/mo
Every 6 months without action = ~£2,760 in avoidable costs
£460/month
Cost of delay (approx.)
2,847+
Businesses already funded
23%
Average cost increase since 2022
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition

Which Grant Applies to You?

PropertyWorkplace Charging SchemeEV Chargepoint Grant — LandlordsEV Chargepoint Grant — Renters & Flat Owners
Who qualifiesBusinesses, charities, public sectorPrivate landlords, housing associations, property managersTenants, flat owners with landlord permission
Grant amount75% up to £500/socket75% up to £500/socket75% up to £500/socket
Max sockets40 sockets across all sites200 sockets across all sites1 socket per property
Apply whenBefore instructing installerBefore instructing installerBefore installation begins
Parking requiredDedicated off-streetDedicated off-streetDedicated off-street
Apply viafind-government-grants.service.gov.ukfind-government-grants.service.gov.ukfind-government-grants.service.gov.uk
Nexgen's RoleGuidance + consultation + installationGuidance + consultation + installationGuidance + consultation + installation
Which Grant Is Right For You?
Do you own or manage the property?
Start here
YES
Commercial or Residential
property?
Commercial
WCS Grant
Up to £500/socket · 40 max · Commercial
Residential
Landlord Grant
Up to £500/socket · 200 max · Residential
NO
Are you a tenant or flat owner?
Renter / Flat Owner Grant
Up to £500/socket · 1 per property · Needs consent letter
WCS
Workplace Charging Scheme 2026
Up to £500/socket, max 40 sockets. For businesses, charities, fleets.
Learn More →
Landlord Scheme
EV Chargepoint Grant — Landlords
Up to £500/socket, residential landlords only. Tenanted properties.
Learn More →
Renter/Flat
EV Chargepoint Grant — Renters & Flat Owners
Up to £500/socket for flat owners. Requires landlord permission letter.
Learn More →
QR
CODE
Scan for latest grant info
find-government-grants.service.gov.uk
£500 max per socket
across all 3 schemes
75% of eligible costs
covered by government
0% VAT
grant amounts are VAT-free
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
Workplace Charging Scheme — Up to £500 per socket, 75% of install cost
For businesses, charities, and public sector bodies with dedicated off-street parking
2
sockets
Grant: £1,000
Install: ~£3,200
Savings: ~£180/mo
Payback: ~12mo
5
sockets
Grant: £2,500
Install: ~£6,500
Savings: ~£450/mo
Payback: ~9mo
10
sockets
Grant: £5,000
Install: ~£11,000
Savings: ~£900/mo
Payback: ~7mo
20
sockets
Grant
£10,000
Install
~£20,000
Savings
~£1,800/mo
Payback
~6mo
Mixed Fleet
10 AC + 2 DC
Grant
£7,000
Install
~£18,000
Savings
~£1,400/mo
Payback
~8mo
Eligibility Checklist
Registered UK business
Sole traders, LTDs, partnerships all qualify
Off-street parking
Must have dedicated parking at your premises
Property you own or have permission for
Landlord consent letter required if leasehold
OZEV-approved installer
Nexgen is fully accredited
Not previously claimed WCS for this location
One application per site
EV or PHEV company vehicles
Or planning to purchase within 6 months
Chargers installed at UK mainland address
Scottish islands may differ
Application before installation
Grant must be pre-approved, never retrospective
Common Mistakes to Avoid
Installing before applying — grant requires pre-approval
Using a non-OZEV installer — application will be rejected
Missing the EICR — electrical certificate required at submission
What Happens After You Apply?
1
Apply Online
Apply direct at find-government-grants.service.gov.uk — all eligibility links are in this pack.
2
OZEV Review
Typically 4–6 weeks. Nexgen tracks your application status.
3
Approval Letter
Valid for 6 months. Nexgen notified directly to arrange installation.
4
Book Installation
Contact Nexgen to schedule — we coordinate everything.
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
Home EV charger installation — landlord property EV charging point

EV Chargepoint Grant for Landlords

Who Qualifies
Private landlord, housing association, or property management company
Property must have dedicated off-street parking for tenants
Chargepoints must be for tenant or leaseholder use
Up to 200 sockets across all your properties
Apply before instructing your installer
EICR must be in date for residential properties
Landlord Grant ROI — 4 Scenarios
ScaleGrantInstall CostMonthly SavingsPayback
1 socket£500~£1,800~£90/mo~15mo
3 sockets£1,500~£3,800~£270/mo~9mo
10 sockets£5,000~£11,000~£900/mo~7mo
30 sockets£15,000~£30,000~£2,700/mo~6mo

*Indicative. Final cost depends on site survey. Contact Nexgen for a fixed-price quote.

Can tenants be billed directly?
Yes — smart chargers with RFID or app billing let tenants pay per kWh. Nexgen configures Monta billing on install.
Will my fuse board cope?
We assess your existing LV infrastructure and upgrade if needed. Load management software prevents overload without costly grid reinforcement.
Is VAT charged on the grant?
No — grant amounts are VAT-free. Installation costs attract 5% VAT for residential properties.
Typical 10-Week Timeline
Site Survey
Week 1
Grant Application
Week 2
Approval
Week 3
Materials Order
Weeks 4–5
EICR + Prep
Week 6
Installation
Weeks 7–8
Commissioning
Week 10
EV vehicle charging point at a residential property
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition

Renters & Flat Owners — What You Can Claim

Your Eligibility
You rent or own a flat (or rent any residential property)
Dedicated off-street parking is available at your property
You are the primary driver of the EV to be charged
You apply BEFORE the chargepoint is installed — not after
The Permission Process
1
Write to your landlord formally
Use recorded post or email with read-receipt. Reference the EV Chargepoint Grant Regulations 2023.
2
Include a quote from an OZEV-approved installer
Nexgen provides free written quotes. The quote must reference the grant scheme and estimated timeline.
3
Await written consent
Landlords must respond within 28 days under the 2023 regulations. Silence is not consent — chase after 14 days if no reply.
4
Apply to OZEV with consent letter attached
Submit online via the gov.uk portal. The consent letter must be on headed paper or signed email.
5
Book installation once approved
You have 6 months from approval to complete installation. Coordinate with Nexgen to schedule at your convenience.
6
Keep records for 5 years
Retain all correspondence, approval letters, and installation certificates. OZEV or local authority spot-checks may request documentation.
Your Legal Rights
Under the EV Chargepoint Grant Regulations 2023, landlords of residential properties cannot unreasonably withhold consent for EV charger installation. If your landlord refuses without good reason, you may escalate to the First-tier Tribunal. Nexgen can provide supporting technical documentation for any tribunal submission.
Home EV charging point installed on residential garage wall
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
Capitol Building, Bracknell — 7 Rolec EV Chargers Installed
OZEV Approved · NICEIC Certified · Monta Smart Charging
Case Study
Rolec EV charger live at KARIUM bay Capitol Building Bracknell
EV INSTALLATION
Rapid Deployment Across 7 Bays
Nexgen installed 7 Rolec WC22 7kW chargers across the Capitol Building's multi-storey car park in under 3 weeks. Each bay required individual trunking runs back to a dedicated sub-distribution board on each floor. Our project manager coordinated directly with the building facilities team to minimise disruption during trading hours. All bays went live simultaneously on completion day, with Monta smart charging activated remotely.
LV distribution board wiring for EV charging infrastructure at Capitol Building Bracknell
LV INFRASTRUCTURE
400A Substation Upgrade
The project required a full LV infrastructure assessment before any charger installation could begin. We identified that the existing 200A supply was insufficient and designed a 400A upgrade in collaboration with the DNO. The new substation feeds three dedicated EV distribution boards, each with load management to prevent grid peaks. This future-proofs the site for up to 120 charging bays as demand grows.
Proteus kiosk crane delivery to Capitol Building Bracknell plant room
LOGISTICS
Crane-Lifted Kiosk Delivery
The Proteus kiosk housing the distribution boards required crane delivery to the fourth-floor mechanical plant room. Nexgen coordinated a 6-hour Sunday morning road closure with Bracknell Forest Council for safe crane operation. All equipment was pre-assembled off-site to minimise on-site time and disruption to tenants. The kiosk was fully wired and operational within 4 hours of delivery.

Nexgen’s project management was exceptional — 7 bays, zero disruption, on time and on budget.

— Facilities Director, Capitol Building Bracknell

Project Overview
ClientCapitol Building, Bracknell
SectorCommercial Real Estate
Chargers7 × Rolec WC22 7kW AC
WCS EligibleUp to £3,500 (7 chargers × £500/socket)
Timeline3 weeks on-site
LV Upgrade200A → 400A
Smart BillingMonta platform
Nexgen Team6 engineers + PM
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition

How Nexgen Delivers Your EV Charging Installation

1
Free Site Survey
We visit your site and assess your parking layout, existing power supply, distribution board headroom, and civil groundworks requirements. No charge, no obligation.
2
Design & Grant Application
We produce a costed design and full site report. You apply direct to OZEV — we provide everything you need to submit with confidence.
3
Certified Installation
Our NICEIC-certified engineers carry out the full installation to BS 7671 18th Edition. Works are planned to minimise disruption to your tenants, staff, and operations.
4
Smart Platform Setup
We configure your Monta charging platform — RFID access control, app connectivity, load balancing, and billing setup — before we leave site.
5
Handover & O&M Documentation
We issue your NICEIC Electrical Installation Certificate and a complete Operations & Maintenance manual — exactly as delivered to Knight Frank LLP at Capitol Building.
Capitol Building EV charging bays live — 7 Rolec chargers installed and active, Nexgen Electrical Innovations
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
⚖️
UK Law Requires EICR Every 3–5 Years for Commercial Properties
Electrical Installation Condition Report — mandatory for all landlords and commercial operators
Before Charger Installation
Visual inspection of consumer unit / distribution board
Testing of all circuits (ring finals, radials, lighting)
Earth continuity and insulation resistance measurements
RCD and RCBO operation testing
Confirmation of sufficient distribution board headroom for EV load
Schedule during low-occupancy hours if possible
Notify tenants/staff 48 hours in advance
Prepare access to all distribution boards
After Installation Sign-off
NICEIC Electrical Installation Certificate (EIC) issued
Full schedule of test results provided to client
C1 and C2 codes remediated before sign-off
Copy supplied to tenant within 28 days of inspection
DNO notification confirmed and documented
Photo-document all defects found
Issue C1 defects immediate notification in writing
Confirm smoke/CO detector function after circuit work
EICR Defect Code Reference
CodeDefect TypeAction Required
C1Danger PresentImmediate remediation — installation must not be used
C2Potentially DangerousUrgent remediation within 28 days
C3Improvement RecommendedNo mandatory action — improvement advised
⚠️
Building owners who fail EICR requirements face fines up to £30,000. Local authorities can issue Improvement Notices requiring remediation within 28 days. Non-compliance is a criminal offence under the Housing Act 2004.
Common EICR Mistakes
Testing only part of the installation — full 100% circuit test required for residential
Missing the Schedule of Inspections — incomplete paperwork invalidates the certificate
Skipping periodic dates — EICR must be renewed every 5 years for rental, 3-5 years for commercial
Our Certification
NICEIC Certified Business — 5 Years
Nexgen Electrical Innovations is NICEIC certified — all EICR work is carried out by qualified engineers to BS 7671 standard.
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition

Why Nexgen Electrical Innovations

Certified & Accredited
100% grant success rate
Nexgen holds OZEV installer accreditation, essential for confirming your installation qualifies for government EV grants. Our team carries NICEIC Commercial Contractor status, the highest level of electrical competence recognition in the UK. We are also Rolec and Monta certified partner installers, meaning we receive manufacturer training and support directly. Every engineer on our team holds AM2 electrical qualifications as a minimum. These accreditations are not just badges — they are conditions of confirming grant qualification for our clients.
Experience at Scale
340+ commercial sites delivered
Since 2019, Nexgen has delivered EV charging infrastructure for over 340 commercial sites across London and the South East. Our projects range from single-socket landlord installations to 64-bay multi-storey car park deployments. We have experience with load management systems, DNO liaison for supply upgrades, and Section 278 agreements for on-street infrastructure. This scale of experience means we anticipate problems before they occur on site. We carry all the documentation insurers and local authorities require without you having to ask.
End-to-End Service
Average 6-week project delivery
From free consultation to certified installation — you apply to OZEV using the guidance in our pack, we handle everything from survey to commissioning. Our Monta partnership means smart charging software, user app billing, and energy management are all configured at handover with no third-party contracts for you to manage. Post-installation, we offer 12-month workmanship warranties and priority callout within 4 business hours. One point of contact, one contract, zero complexity.
Local Knowledge
South East & South Wales specialists
Headquartered in Taplow, South Bucks, Nexgen serves commercial and residential clients across South East England and South Wales — from London car parks to Cardiff city-centre estates. We have established relationships with UK Power Networks (South East) and Western Power Distribution (Wales) for fast DNO applications across both regions. Our local presence means site surveys happen within 5 working days, not the 4–6 week waits common with national contractors. We carry all documentation insurers and local authorities require, and understand the planning constraints specific to both Welsh commercial properties and South East commercial estates. Local knowledge in two regions translates directly into faster approvals and lower project costs.
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037
Nexgen Electrical Innovations
EV Chargepoint Grant Support Pack
OZEV Approved Installer · 2026/27 Edition
Book a Free Survey
No obligation. Results in 5 working days.
Book Now →
Check Your Eligibility
2-minute online form. Instant result.
Check Now →
Call Us Now: 03333 356 037
Mon-Fri 8am-6pm. Saturday 9am-1pm.
Call Now →
The Nexgen Guarantee
100% grant success rate — we only take on projects we know will qualify
Fixed-price quotes — no hidden extras after survey
NICEIC-certified engineers on every install
12-month workmanship warranty as standard
Also From Nexgen
EV Installation
EV Installation
From single sockets to 7-bay multi-storey deployments. OZEV-approved for all government grant schemes. Rolec and Monta partner installer.
View Projects →
LV Infrastructure
LV Infrastructure
400A substation upgrades, load management, DNO liaison. All included in your project scope. No subcontractors — our own engineers throughout.
Get Quote →
EICR Testing
EICR Testing
5-year and 3-year periodic inspection certificates. C1/C2 defect remediation same-week. Combined EICR + EV install packages available.
Book EICR →
Proteus electrical distribution kiosk delivered by lorry to Capitol Building Bracknell — EV infrastructure installation
Monta Smart Charging Platform
Complete installation and configuration of Monta RFID, app billing, load balancing, and energy reporting. Compatible with Rolec, ABB, Kempower, and all major EVSE hardware. We remain your Monta support contact post-installation.
Learn More →
KARIUM EV charging bay markers reinstated on block paving after civil works — Capitol Building Bracknell
Landlord Grant Management — End to End
End-to-end landlord EV service — EICR, installation, Monta tenant billing, and full grant guidance so you can apply direct to OZEV with confidence. Multi-site landlord portfolio management available. Delivered at 45+ residential and commercial estates across London and the South East.
Learn More →
Nexgen Electrical Innovations · 46 Nursery Road · Taplow · SL6 0JZ
OZEV Approved · NICEIC Certified · Rolec Accredited · Monta Partner · nexgen-electrical.co.uk · info@nexgen-electrical.co.uk
Scan to open grant guide
Scan to open online
Nexgen Electrical Innovations · OZEV Approved Installer · NICEIC Certified · Rolec Accredited
nexgen-electrical.co.uk · 03333 356 037