EV Charging Infrastructure Guide

This guide covers every decision a commercial property owner or facilities manager needs to make before commissioning EV charging infrastructure — from charger type and power capacity, through civil groundworks and smart platform selection, to NICEIC certification and OZEV grant eligibility. Whether you're installing two bays or forty, the questions are the same. We've answered them here.

NI

NICEIC

Approved Contractor — independently audited to the highest UK electrical safety standard

RL

ROLEC

Accredited Installer — certified for Type 2 AC and rapid DC charger installations

MN

MONTA

Charging Partner — smart platform management, load balancing, and back-office support

OZ

OZEV

Approved Installer — authorised to submit Workplace and Landlord grant applications

47+ EV Bays InstalledRolec Approved InstallerNICEIC Certified

OZEV grant funding may be available for eligible commercial EV installations — ask about eligibility during your free site survey.

Explore
Why This Guide Exists

Frompowersupplytocertifiedcharger

Commercial EV charging is an infrastructure decision, not just a product purchase. The gap between having power at your site and having certified, grant-funded EV chargers in your car park is filled by decisions that most property managers have never had to make before. This guide closes that gap.

Whether your site needs two bays or forty, the infrastructure questions are the same: supply capacity, distribution board headroom, civil groundworks, smart platform selection, and DNO notification thresholds. Getting them right at the start avoids cost overruns and programme delays.

OZEV grant funding is available for eligible installations, but only for contractors on the approved installer list — and the application process has specific documentation requirements. This pack gives you every link and eligibility check you need to apply direct to OZEV — and because we've done hundreds of these sites, we'll tell you exactly what to expect before you apply.

01

Infrastructure First

Charger hardware is the last decision, not the first. Supply capacity, distribution board headroom, and civil groundworks determine what is possible at your site — and what it will cost.

02

Grant Eligibility

The Workplace Charging Scheme and the EV Infrastructure Grant cover different site types. We assess which scheme fits your property and support the application so funding is secured before work begins.

03

Certified on Completion

Every installation is certified to BS 7671 and issued with the full NICEIC documentation package — the paperwork your OZEV grant claim, building control, and insurers require.

About This Guide

Most commercial properties are already connected to the power they need.

The gap between having power and having EV charging is almost always infrastructure, not electricity. This guide walks you through every decision — charger type, power capacity, civil works, smart platform, and certification — so you arrive at your site survey knowing exactly what to ask.

  • Charger types explained — AC Type 2, DC rapid, tethered vs untethered, single vs three-phase
  • DNO application process, 69kW threshold triggers, and what causes the longest delays
  • Smart charging mandates, sub-metering requirements, and how OZEV grant eligibility is assessed
  • What to ask your contractor at the site survey — and what their answers should tell you
ContentCommercial EV infrastructure — chargers, groundworks, certification
AudienceCommercial property owners, facilities managers, fleet operators
Reading Time8 min read
Published2026
N

Nexgen Technical Team

NICEIC Approved Contractor

What's Covered

What's inside this guide

  • The difference between AC Type 2, DC rapid, and tethered chargers — and which suits your site
  • Why three-phase power matters for multi-bay commercial EV installations
  • How civil groundworks — trenching, conduit, reinstatement — affect cost and programme
  • How to evaluate OZEV Workplace Charging Scheme eligibility for your property
  • What a Rolec or Monta smart charging platform gives you beyond the charger hardware
  • What NICEIC certification covers and what documentation you receive on completion

Infographic

NEXGEN ELECTRICAL · EV CHARGING INFRASTRUCTURE GUIDE

The Commercial EV Charging Infrastructure Guide

8 questions every property manager must answer before commissioning EV chargers.

EV Board FirstDNO 69kW+ ThresholdSmart Charging MandatorySub-Metering by Design

nexgen-electrical.co.uk/ev-charging-infrastructure-guide.pdf

Rolec Type 2 EV charger at KARIUM car park, Capitol Building Bracknell — a commercial installation by Nexgen
OZEV Approved
NICEIC Certified
Rolec Accredited
Grant Funding Support

Three grant schemes could cover up to 75% of your install

Three UK government grant schemes are currently funding commercial and landlord EV chargepoint installations through to 31 March 2027. We help you work out which one applies to your site — here's how.

Free Site Survey

We assess your parking layout, existing power supply, and likely civil works on site, then give you a realistic cost ballpark before you commit to anything.

Grant Eligibility Guide

We'll explain in plain English whether the Workplace Charging Scheme, the Landlord Grant, or the Renter/Flat Owner Grant fits your situation, and link you to the official gov.uk pages to apply.

Why Now

Grant funding is moving to a £500-per-socket cap from April 2026 and schemes run to March 2027. Landlords letting parking to tenants may also want our Landlord EICR Checklist — see below.

We've helped dozens of commercial sites navigate the grant process. Most clients are surprised how straightforward the eligibility criteria is — and how quickly they can apply once they have the right guidance.

Nexgen Technical Team — OZEV Approved Installer, NICEIC Certified

EV Grant Schemes

Which EV Grant Applies to You?

Workplace Charging Scheme

The Workplace Charging Scheme (WCS) is a voucher-based government grant that covers 75% of the purchase and installation cost of EV chargepoints — up to £500 per socket. Eligible businesses can claim up to 40 sockets per applicant and must have dedicated off-street parking available for staff or fleet use.

  • Business must be UK-registered with dedicated off-street parking
  • Chargepoints must be for staff or fleet vehicle use
  • Up to 40 sockets per applicant
  • Apply via OZEV before instructing a contractor

Grant Amount

75% up to £500 per socket

Check WCS Eligibility
Nexgen Electrical EV charging bays live at Capitol Building car park, Bracknell
LV INFRASTRUCTURE ASSESSMENT

Book Your LV Feasibility Assessment with Nexgen

  • Free, no-obligation assessment
  • LV board capacity reviewed against EV load requirements
  • DNO threshold confirmed — we handle any notification
  • Full written report with recommended next steps
Book Assessment →
NICEIC ApprovedOZEV Authorised InstallerEV Board FirstFree · No Obligation
Get Your EV Survey

Start Your EV Project

Tell us about your site and requirements and we'll arrange a free site survey. No obligation — we'll come back with a detailed specification and fixed price.

Fields marked * are required.

Site Details

Tell us about the site where you need EV charging installed

Required

Full street address of the installation site

Optional — helps us prepare for your site

FAQs

Frequently Asked Questions

What EV charger types are available for commercial properties?

For commercial installations, the main options are AC Type 2 chargers (7kW per bay — standard for workplace and car park use), DC rapid chargers (50kW+ — suited to high-dwell destinations such as retail and hospitality), and smart tethered units with a fixed cable for ease of use. Most commercial car park installations use AC Type 2 units managed via a smart platform such as Monta or Rolec's management system.

Does my site need three-phase power for EV charging?

For two or three chargers, a single-phase supply can work. For four or more bays, three-phase is almost always the right choice — it gives you balanced load across phases, lower cable size requirements per circuit, and headroom for future expansion without a further supply upgrade. A site survey will confirm your existing supply capacity and whether an upgrade to the LV incomer is required.

Is OZEV grant funding available for my installation?

The Workplace Charging Scheme (WCS) provides up to £350 per socket (maximum 40 sockets) for eligible employers installing chargers at their workplace. The EV Infrastructure Grant supports eligible owner-occupied and leasehold commercial properties. Eligibility depends on property ownership type, use, and existing power supply. We assess eligibility during your free site survey and support the application process.

How long does a commercial EV installation take?

A typical commercial installation — supply assessment, civil groundworks, distribution kiosk, and charger install — runs two to three weeks from start to NICEIC certification. Sites requiring planning permission for external kiosks or significant civil works may take longer. Our Capitol Building, Bracknell installation (7 bays, 45m armoured cable run, full civil groundworks and block paving reinstatement) completed in under three weeks.

Does the car park need to close during installation?

In most cases, no. We phase the work to keep sections of the car park operational throughout. Open trenches are covered with hazard plates at all times. Charger bays are typically taken out of use one or two at a time for final connections and commissioning. The Capitol Building installation kept the KARIUM car park partially operational throughout the full programme.

What ongoing maintenance does an EV charger need?

Commercial chargers benefit from an annual electrical inspection and a firmware/software check to keep smart-charging features current. We offer maintenance plans that bundle this with your wider electrical compliance schedule, so it's one less thing to track separately.

Can you install EV chargers alongside our existing distribution board, or do we need an upgrade?

It depends on your site's spare capacity. During the free site survey we check your distribution board and incoming supply against the number and power rating of chargers you want — many sites can take several chargers with smart load management before any board upgrade is needed.

What warranty and support do you provide after installation?

All installations carry manufacturer warranty on the chargers themselves (typically 2-3 years depending on model) plus our own workmanship guarantee. We're also available for fault callouts and ongoing servicing once the install is live.

Will I receive certification once the installation is complete?

Yes — every installation is certified to BS 7671 and issued with the relevant electrical installation certificate, plus any documentation your OZEV grant claim requires. NICEIC approval means this paperwork is recognised by building control and insurers.

How is the cost of a commercial EV installation typically structured?

Costs scale with the number of chargers, the civil works needed to route power to the bays, and whether your distribution board needs upgrading. Your free site survey gives you a clear cost ballpark before you commit, broken down so you can see exactly what grant funding could offset.

Related Services

How we can help

EV Installation & Management

EV Installation & Management

End-to-end commercial EV charging — site survey, design, supply upgrade, civil works, charger install, Rolec and Monta platform setup, NICEIC certification.

Get EV Survey
LV Infrastructure

LV Infrastructure

400V supply upgrades, distribution boards, cable routes, and LV civil works to support commercial EV charging and power demands.

Learn More
EICR Testing

EICR Testing

Electrical Installation Condition Reports for commercial and industrial properties — required before connecting EV infrastructure to an existing installation.

Learn More
Landlord EICR Checklist

Landlord EICR Checklist

Letting parking alongside a rental property? Your EICR compliance obligations and inspection timeline, explained in full.

Read the Checklist

Featured Project

See the Work in Practice

Seven Rolec Type 2 chargers, 400V three-phase supply, civil groundworks, and full NICEIC certification — this commercial EV installation at Capitol Building, Bracknell is an example of the end-to-end delivery Nexgen provides for multi-bay commercial car parks across the South East.

Capitol Building Bracknell — Rolec EV charger operational at KARIUM car park bay
Featured
Completed

Featured Project // Commercial Property

Capitol Building EV Charging — Bracknell

400V three-phase EV charging infrastructure for the KARIUM car park at Capitol Building, Bracknell. Seven Rolec pedestals, fourteen charging sockets, Proteus GRP distribution kiosk, 49m 150mm² SWA sub-main, and Monta OCPP 1.6J smart charging platform. EIC certified 15 May 2026.

Scope

Design & Install

Timeline

6 weeks

Capacity

7 × Rolec / 14 sockets

Location

Bracknell, Berkshire

Progress100%
EV ChargingCommercial EVCommercial400V Three-PhaseRolecCivil WorksMonta OCPPNICEIC Certified

Related Articles

Further Reading

Go deeper on the technical and compliance topics covered in this guide — practical articles from the Nexgen knowledge base for property owners, landlords, and facilities managers.

Three-phase distribution board — commercial electrical infrastructure for EV charging
Insights
26 MAY 2026  8 min

EV Charging Infrastructure: From LV Board to Charging Point

Your building has 40 parking spaces. You've been asked to install 20 EV chargers. Here's what nobody tells you until it's too late: EV charging is an LV infrastructure problem first, and a car park problem second. What commercial properties need to assess and upgrade before a single charger is specified.

Residential EV charging point — wall-mounted home electric vehicle charger
Residential
26 MAY 2026  6 min

Home EV Charging: What Your Electrical System Needs First

Just bought an EV — or about to? Before you ring an installer, three things are worth checking about your home's electrical system. Consumer unit capacity, earthing arrangement, and smart charger compliance determine whether your installation is a straightforward job or something that needs engineering first.

Commercial EV charging infrastructure — multi-point fleet charging site
Commercial
25 MAY 2026  8 min

Large-Scale EV Fleet Charging: What Commercial Sites Get Wrong Before the First Charger Goes In

Most commercial sites that attempt a multi-charger EV deployment discover the LV infrastructure problem after the charge points have been specified. The load analysis, DNO engagement, and smart charging strategy must come first — before a single unit is selected.