Landlord Compliance Resources

EICR Landlord Compliance Guide

This checklist covers every electrical safety obligation a landlord or property manager faces before and after an EICR — from understanding what inspectors look for, through remediation timescales, to issuing compliant reports to tenants and lenders. Whether your portfolio is one property or fifty, the requirements are the same. We've laid them out clearly here.

NI

NICEIC

Approved Contractor — independently audited to the highest UK electrical safety standard

18

BS 7671

18th Edition — wired and tested to current IET Wiring Regulations 2018

EI

EICR

Certified Reports — legally compliant documentation accepted by all major lenders

PP

PART P

Registered — all domestic electrical work notified to local authority as required

200+ EICR Reports IssuedNICEIC Approved ContractorServing Surrey & Berkshire

EICR is a legal requirement for all private rental properties in England since 1 June 2020 — reports must be provided to tenants within 28 days of a written request.

Explore
Why This Checklist Exists

YourEICRobligations,clearlylaidout

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 created a legal duty that applies to every private landlord — whether you own one property or fifty. The checklist you are reading covers what inspectors look for, what happens when they find issues, and what the paperwork requires.

An EICR is not a pass/fail test. It uses a code system — C1, C2, C3 — that determines what you are legally required to do next, and within what timescale. Understanding those codes before your inspection removes the ambiguity that catches most landlords out.

Beyond the legal requirement, a valid EICR protects you at change of tenancy, satisfies mortgage lender requirements, and ensures your property insurance remains valid. This guide covers all three consequences so you know exactly what is at stake.

01

Know the Codes

C1 means danger present — immediate action required. C2 means potentially dangerous — remedial work within 28 days. C3 is a recommendation only. The code your report carries determines your legal obligations.

02

Tenant Obligations

You must provide a copy of the EICR to each tenant within 28 days of a written request, and to your local authority within 7 days of their request. New tenants must receive it before they move in.

03

NICEIC Documentation

Certification from an NICEIC Approved Contractor produces the legally recognised documentation your local authority, mortgage lender, and insurer require — and confirms Part P compliance for any remedial work.

About This Guide

Most landlords already know they need an EICR. The risk is in not knowing what to do when it flags issues.

This checklist walks you through your legal obligations, what EICR codes C1, C2, and C3 mean in practice, how to prepare a property for inspection, and what remedial work looks like — so you are never caught out by a compliance deadline or a tenant request.

  • What EICR inspectors look at — and what a C1, C2, and C3 code actually means for your property
  • Remediation timescales — what the law requires, what insurers expect, and when you must act
  • How to issue a compliant report to tenants, letting agents, and mortgage lenders
  • Part P obligations, NICEIC certification, and why your contractor's paperwork matters as much as the work
ContentEICR obligations, inspection process, remedial codes, compliance timeline
AudienceLandlords, HMO operators, letting agents, property managers
Reading Time6 min read
Published2026
N

Nexgen Technical Team

NICEIC Approved Contractor

What's Covered

What's inside this guide

  • Your exact legal obligations under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
  • What EICR codes C1, C2, and C3 mean — and which require remedial work before re-letting
  • The 28-day rule: your obligations for providing EICR reports to tenants on written request
  • When you need a new EICR — at change of tenancy, every 5 years, and HMO-specific requirements
  • How to prepare a property for inspection and reduce the risk of re-test after remedials
  • What remedial work typically involves and how unresolved C1/C2 codes affect Section 21 notices

Infographic

NEXGEN ELECTRICAL · LANDLORD COMPLIANCE GUIDE

The Landlord's EICR Compliance Guide

What the 2020 Electrical Safety Standards require of every private landlord.

EICR Every 5 Years28-Day Tenant DeliveryC1/C2 RemediationHMO Licensing Condition
Download the Free Compliance Guide

nexgen-electrical.co.uk/landlord-eicr-checklist.pdf

Rolec Type 2 EV charger at a commercial car park — landlord EV chargepoint grant installation by Nexgen
OZEV Approved
NICEIC Certified
Rolec Accredited
EV Chargepoint Grant Support

Letting parking to tenants? Grant funding could cover 75% of EV chargepoints

If your rental property has off-street parking, two UK government grant schemes are currently funding EV chargepoint installations for landlords and tenants through to 31 March 2027 — a natural next step alongside your EICR.

Free Site Survey

While we're on site for your EICR, we can also assess your parking and existing power supply for EV chargepoint feasibility, with a realistic cost ballpark.

Grant Eligibility Guide

We'll explain in plain English whether the Landlord Grant or the Renter/Flat Owner Grant fits your property, and link you to the official gov.uk pages to apply.

Document & Cost Pack

Download our free EV Chargepoint Grant Support Pack — a complete checklist covering landlord and tenant grant schemes, eligibility criteria, and typical chargepoint installation costs before and after funding.

Why Now

Grant funding is moving to a £500-per-socket cap from April 2026 and schemes run to March 2027. See our EV Charging Infrastructure Guide for the full commercial and landlord breakdown.

Landlords are often surprised that EV chargepoint grants apply to their rental properties — especially if no tenant has asked about EV charging yet. The time to understand your options is before they do.

Nexgen Technical Team — OZEV Approved Installer, NICEIC Certified
Nexgen Electrical EV charging bays live at Capitol Building car park, Bracknell
LV INFRASTRUCTURE ASSESSMENT

Book Your LV Feasibility Assessment with Nexgen

  • Free, no-obligation assessment
  • LV board capacity reviewed against EV load requirements
  • DNO threshold confirmed — we handle any notification
  • Full written report with recommended next steps
Book Assessment →
NICEIC ApprovedOZEV Authorised InstallerEV Board FirstFree · No Obligation
Get Your Free Site Survey

Book Your Property Survey

Tell us about your property and we'll arrange a free survey. No obligation — we'll come back with a detailed specification and fixed price.

Fields marked * are required.

Site Details

Tell us about the site where you need EV charging installed

Required

Full street address of the installation site

Optional — helps us prepare for your site

FAQs

Frequently Asked Questions

How often does a rental property need an EICR?

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, all private rental properties require an EICR at least every 5 years, or at every change of tenancy — whichever comes first. HMO properties may require more frequent inspection under your local authority licence conditions. Check your licence for specific requirements.

When did the EICR landlord requirement become law?

The Electrical Safety Standards Regulations came into force in England on 1 June 2020 for new tenancies and were extended to all existing tenancies from 1 April 2021. All private landlords in England must hold a valid EICR for every rental property. Scotland has separate legislation with its own compliance timeline.

What are C1, C2, and C3 codes on an EICR?

C1 (Danger Present) requires immediate remedial action — the property cannot be let until the issue is resolved. C2 (Potentially Dangerous) requires remedial work completed within 28 days. C3 (Improvement Recommended) does not legally require action but should be addressed over time. An EICR with one or more C1 or C2 codes is classified as Unsatisfactory — you must provide evidence of completed remedial work to your local authority within 28 days of receiving the report.

What happens if I do not have a valid EICR?

Local authorities can issue a remedial notice requiring you to obtain an EICR and complete any required work. Failure to comply with a remedial notice can result in a civil penalty of up to £30,000. Without a valid EICR you may also be unable to serve a valid Section 21 notice in some circumstances, which can complicate the process of regaining possession of your property.

How long does an EICR inspection take?

For a standard 2 or 3 bedroom rental property, an EICR typically takes 2 to 4 hours depending on the age of the installation and accessibility of the consumer unit and wiring. Larger properties or HMOs may take longer. Part of the test requires the power to be turned off — we coordinate this with the tenant in advance. The NICEIC certificate and report are issued on the day.

Who is responsible for arranging the EICR — me or my letting agent?

Legal responsibility sits with the landlord, even if a letting agent manages the property day-to-day. If you use an agent, confirm in writing whether arranging and paying for the EICR is part of their management agreement — we're happy to liaise directly with agents to keep the paper trail clear for whoever holds the responsibility.

Can I get an EICR done if the property is currently tenanted?

Yes — most EICRs are carried out on occupied properties. We just need access to the consumer unit and a short period where the power can be switched off for testing, which we agree directly with your tenant in advance. A courtesy call from us to the tenant usually settles any access concerns.

Does an EICR cover portable appliances like kettles or lamps?

No — an EICR only covers the fixed wiring installation: consumer unit, sockets, switches, and fixed wiring. Portable appliances supplied with the property (if any) fall under PAT testing, which is a separate check. We offer both as part of the same maintenance plan if you'd rather not arrange them separately.

I'm planning to offer EV charging for tenants — does that affect my EICR?

Yes — any EV chargepoint wiring becomes part of the fixed installation your EICR covers, so it's worth having both assessed together. If you're considering adding a chargepoint, ask us about a feasibility check during your EICR visit — grant funding currently available for landlords could cover a significant share of the install cost. See our EV Charging Infrastructure Guide for the full breakdown.

Will an EICR flag old-style fuse boards or rewiring needs in older rental properties?

Yes — an outdated fuse board, lack of RCD protection, or old cabling are common reasons a property comes back Unsatisfactory, particularly in older housing stock. These usually carry a C2 code, meaning remedial work is required within 28 days. We'll always give you a clear quote for the fix alongside the report, so there's no surprise once the test is done.

Related Services

How we can help

EICR Testing

EICR Testing

Full Electrical Installation Condition Reports for rental properties — NICEIC certified, landlord certificate and report issued on completion.

Book EICR
Maintenance Plans

Maintenance Plans

Scheduled electrical maintenance for landlords and portfolio managers — EICR, PAT testing, and reactive callouts in a single managed plan.

Get Maintenance Plan
Domestic Services

Domestic Services

Full domestic electrical services for rental property upgrades — consumer unit replacements, rewires, and compliance rectification.

Learn More
EV Charging Infrastructure Guide

EV Charging Infrastructure Guide

Considering EV chargepoints for tenant parking? Our full guide to charger types, power supply, and grant funding for landlords.

Read the Guide

Featured Project

See the Work in Practice

A completed electrical compliance survey and certification — the standard of documentation and reporting Nexgen delivers for landlords and property managers across the South East.

Capitol Building Bracknell — Rolec EV charger operational at KARIUM car park bay
Featured
Completed

Featured Project // Commercial Property

Capitol Building EV Charging — Bracknell

400V three-phase EV charging infrastructure for the KARIUM car park at Capitol Building, Bracknell. Seven Rolec pedestals, fourteen charging sockets, Proteus GRP distribution kiosk, 49m 150mm² SWA sub-main, and Monta OCPP 1.6J smart charging platform. EIC certified 15 May 2026.

Scope

Design & Install

Timeline

6 weeks

Capacity

7 × Rolec / 14 sockets

Location

Bracknell, Berkshire

Progress100%
EV ChargingCommercial EVCommercial400V Three-PhaseRolecCivil WorksMonta OCPPNICEIC Certified

Related Articles

Further Reading

Go deeper on the technical and compliance topics covered in this guide — practical articles from the Nexgen knowledge base for property owners, landlords, and facilities managers.

PAT testing engineer testing external air conditioning unit — portable appliance testing compliance
Residential
29 MAY 2026  6 min

What Landlords Must Know About EICR and Electrical Safety

Every private landlord must obtain an EICR every five years under the 2020 Electrical Safety Standards regulations. Appliance testing under the Electricity at Work Regulations is a separate, secondary obligation that applies only where the landlord supplies appliances as part of a furnished let.

Commercial electrical cable containment tray installation — NICEIC Approved Contractor work
Insights
21 MAY 2026  6 min

NICEIC Approved Contractor Status: What It Actually Means for Your Project

Over 25,000 businesses display the NICEIC mark — but Approved Contractor status involves a physical on-site assessment that most clients have never investigated. Here is what that inspection involves and why it matters when you are selecting an electrical contractor for commercial or industrial work.

BS 7671 18th Edition wiring regulations — electrical compliance reference
Insights
22 MAY 2026  8 min

BS 7671 18th Edition: What the Current Wiring Regulations Mean for Your Electrical Installation

The 18th Edition of the IET Wiring Regulations has been amended twice since publication — and the second amendment, mandatory since March 2023, changed the rules on AFDDs, RCD types, and SPDs in ways that affect most commercial and residential installations. Here is what you need to know.