Quality Assured
Commercial EV charging infrastructure installation projects.
Quality Assured
Safe Installation
Progress Tracking
Complete Handover
Every project in this category is completed to the same standard: NICEIC approved operatives, BS 7671 compliant installation, and full certification documentation issued at handover. Size and sector vary — the standard does not.
Our project methodology covers full scoping, design, containment, cabling, first and second fix installation — with every stage supervised by NICEIC-registered operatives. At completion, each project is issued with the correct certification documentation: EICR, EIC, test results, and as-installed records as required by the contract.
We regularly work within live environments and phased construction programmes, coordinating with principal contractors, M&E consultants, and facilities management teams. Our supply chain partnerships and on-site supervision structure allow us to integrate cleanly into larger programmes without disruption to ongoing operations or other trades.
Full design-and-install capability — no subcontracting the design stage. Our in-house engineers produce specifications, layouts, and load calculations, giving clients a single point of accountability from instruction through to handover.
Every project is handed over with the complete certification package included as standard: NICEIC approval record, EICR, Electrical Installation Certificate, and full test results. Nothing is outstanding at the point of handover.
Structured to fit within principal contractor timelines and phased programmes. We work within live site environments, coordinate with other trades, and commit to milestone dates — with the supervision and resource to meet them.
From single-site installations to multi-site FM contracts, Nexgen Electrical Innovations delivers commercial, residential, and industrial electrical works on programme and within budget.
Tell us about your project and we'll provide a detailed, no-obligation quote within 24 hours. NICEIC approved — every time.

400V three-phase EV charging infrastructure for the KARIUM car park at Capitol Building, Bracknell. Seven Rolec pedestals, fourteen charging sockets, Proteus GRP distribution kiosk, 49m 150mm² SWA sub-main, and Monta OCPP 1.6J smart charging platform. EIC certified 15 May 2026.