Quality Assured

Full Cat B fit-out and electrical infrastructure for commercial and logistics facilities.
Quality Assured
Safe Installation
Progress Tracking
Complete Handover
Cat B fit-outs, LV distribution upgrades, and retail refurbishments completed on programme, with full 18th Edition test certification and O&M documentation issued at handover. Evidence, not assertions.
Our commercial delivery model runs from pre-tender scoping through commissioning and handover — DB specification, first and second fix programming, M&E principal contractor coordination, NICEIC-approved operatives on site, and 18th Edition test certificates at practical completion. Every project is managed with a named supervisor and real-time programme reporting to the principal contractor.
Whether the commission is a single-floor Cat B fit-out or a multi-site retail roll-out, the handover standard is identical: a signed handover pack containing certification, test results, and as-installed records — nothing outstanding, nothing to chase. That consistency is what makes Nexgen a preferred subcontractor for repeat principal contractor relationships.
Schneider LV specification, MCCB sizing, and distribution board design and installation for commercial loads — from single-floor Cat B to multi-zone logistics facilities.
Containment, cabling, board installation, and final fix all delivered under a single subcontract — one programme, one point of accountability, no interface gaps.
18th Edition test certification, circuit schedules, O&M documentation, and Building Regulations compliance included as standard at practical completion on every project.
From single-site installations to multi-site FM contracts, Nexgen Electrical Innovations delivers commercial, residential, and industrial electrical works on programme and within budget.
Tell us about your project and we'll provide a detailed, no-obligation quote within 24 hours. NICEIC approved — every time.

Full Cat B electrical fit-out for DHL's Reading parcel sorting and distribution hub, encompassing conveyor power infrastructure, Schneider LV distribution, office fit-out, and emergency systems across a high-throughput logistics facility.

Full electrical fit-out for Medivet's flagship 18,000 sqft Watford veterinary practice — a dual-wing healthcare facility requiring dedicated fuseboards for each wing, healthcare-grade compliance, and precise coordination with Woodhouse Workspace across a live construction programme.

Full electrical Cat B fit-out for Ladbrokes' 12,000 sq ft FTSE100-standard Woking retail betting shop across two concurrent wings — delivered live in an operational retail environment.

Design and installation of a new fully operational 3-phase electrical supply system for Biffa's workshop facility in Farnham, Surrey — a landmark project that established Nexgen as Biffa's preferred electrical partner.