Ladbrokes Woking retail electrical fit-out — completed trading floor
Completed
Commercial
Project // Active
Retail & Betting Sector

Ladbrokes WokingRetail Fit-Out

Full electrical Cat B fit-out for Ladbrokes' 12,000 sq ft FTSE100-standard Woking retail betting shop across two concurrent wings — delivered live in an operational retail environment.

Retail Fitout

Full Category A to B retail electrical fit-out delivered to Ladbrokes brand specification.

Feature Lighting

Bespoke retail lighting design with LED feature strips, display lighting and emergency systems.

Part P Certified

Complete installation certified under Part P with full EICR issued at handover.

Fast Track

Completed within tight retail refurbishment programme to meet opening date requirements.

NICEIC Approved|Part P Certified|24/7 Emergency|4 Active Projects
Projects/
Categories/
Commercial/
/
Ladbrokes Woking — Retail Electrical Fit-Out
Commercial Project

LadbrokesWoking.DeliveredLive.

When Woodhouse Contracts brought Nexgen in for Ladbrokes' Woking flagship, the brief was unambiguous: FTSE100 specification, zero customer disruption, 10-week delivery. Nexgen said yes — and delivered exactly that across two concurrent wings of a live retail betting shop.

The Woking fit-out is a full Cat B electrical installation across 12,000 sq ft of retail betting space — north and south wings progressing simultaneously on independent programme tracks, with every phase of work scheduled around the shop's trading hours to ensure not a single customer interaction was lost.

Nexgen's installation team worked in close coordination with Woodhouse Contracts throughout, from pre-construction planning to final BS 7671 sign-off — delivering a complete electrical installation that met Entain plc's exacting standards for their FTSE100-listed retail estate.

01

FTSE100 Specification

Every installation met the exacting electrical standards required for a listed-company retail estate — from the 400A TPN main board through to final fix and certification.

02

Two-Wing Phasing

North and south wings progressed simultaneously with independent programme tracks — no cross-dependency delays, maximum installation velocity.

03

Live Retail Environment

Work executed during off-peak hours to maintain customer operations throughout the full 10-week programme — zero trading disruption.

04

Programme Certainty

Daily coordination with Woodhouse Contracts ensured every trade handover landed on schedule, with no programme-critical incidents across the full duration.

Woodhouse Brought Nexgen In for a Reason

Woodhouse Contracts had seen Nexgen deliver on complex commercial fit-outs before. When Entain plc — Ladbrokes Coral's parent group — needed a reliable electrical subcontractor for their Woking flagship, Woodhouse didn't hesitate. The brief was clear: FTSE100 standards, no retail disruption, 10-week delivery. Nexgen said yes.

Scope of Work

Precision Engineering, Comprehensive Delivery.

Every project demands a tailored approach. Our scope encompasses the full spectrum of electrical infrastructure — from initial assessment through final commissioning — ensuring seamless integration and long-term reliability.

400A TPN Distribution Board

Main 400A TPN distribution board installation — serving both wings from a consolidated intake point, with metering and protection to Entain specification.

First Fix Wiring

Full first-fix wiring across both north and south wings, with containment and cabling routed through ceiling voids ahead of follow-on trades.

Consumer Unit Installation

Consumer unit installation across both wings, circuit-tested and certified to BS 7671 — providing independent protection and load management for each zone.

LED Lighting — Trading Floor & BOH

LED lighting design and installation across the full trading floor and back-of-house areas, meeting Ladbrokes' brand specification and CIBSE lux level guidance.

Emergency Lighting

Full emergency lighting system installation — maintained fittings at all escape routes, exits, and risk areas — installed and commissioned to BS 5266.

Cable Containment & Tray Routing

Cable containment and tray routing through ceiling voids across both wings, co-ordinated with structural and fit-out trades to maintain programme sequence.

Second Fix & Final Connection

Complete second-fix including socket outlets, accessories, EPOS power provisions, self-service terminal supplies, and final connections throughout both wings.

Testing, Commissioning & Certification

Full NICEIC-compliant circuit testing, BS 7671 certification, snagging, and formal handover to Woodhouse Contracts at practical completion.

Betting Shops Don't Close for Electrical Works

Every phase of this project happened while Ladbrokes served customers. That meant no noisy containment work during peak hours, no ceiling access above active trading areas, and no disruption to the EPOS and self-service systems running 12 hours a day. Nexgen's team planned around the retail schedule — early starts, late finishes, and a daily sync with Woodhouse to keep the programme intact.

Engineering Excellence

Meeting Every Challenge Head On.

Complex electrical projects rarely follow a straight line. Our engineers thrive in high-constraint environments — designing solutions that protect operations, meet deadlines, and stand the test of time.

The Challenge

Running two concurrent wing programmes inside a live retail betting shop — where any disruption to trading meant direct revenue loss for the client — demanded exceptional coordination, off-peak scheduling, and a phased approach that maintained operational continuity at every stage. The FTSE100 specification from Entain plc left no room for non-compliant workmanship or programme overruns.

Our Solution

Nexgen implemented a wing-by-wing phasing strategy with dedicated teams on each zone. Daily programme huddles with Woodhouse Contracts kept every trade sequenced correctly, and all high-impact work — distribution board energisation, ceiling void access, floor-level containment — was scheduled outside customer-facing hours. Pre-construction planning locked in access windows before mobilisation, eliminating surprises during the live programme.

Project Timeline

A Methodical Approach to Delivery.

Every phase is planned, sequenced, and executed with precision. From initial assessment through to commissioning, we keep every milestone visible and every deadline on track.

  • Phase 1

    3 weeks

    Phase 1

    3 weeks

    Mobilisation&FirstFix

    completed

    Site setup, cable containment installation, and first-fix wiring across both wings — co-ordinated with Woodhouse to avoid trade conflicts.

  • Phase 2

    2 weeks

    Phase 2

    2 weeks

    DistributionBoard&Containment

    completed

    400A TPN main board installation and full cable tray routing through ceiling voids — energisation scheduled outside trading hours.

  • Phase 3

    3 weeks

    Phase 3

    3 weeks

    SecondFix&Lighting

    completed

    Second-fix wiring, LED lighting installation, emergency lighting fit, and consumer unit commissioning across both wings simultaneously.

  • Phase 4

    2 weeks

    Phase 4

    2 weeks

    Testing,Commissioning&Handover

    completed

    Full circuit testing, BS 7671 certification, snagging remedials, and formal handover documentation issued to Woodhouse Contracts.

Project Gallery

Captured at Every Stage.

From groundworks to final commissioning, these images document the precision and care that goes into every Nexgen installation.

4 more images

Delivered On Time. Zero Disruption. FTSE100 Sign-Off.

The Ladbrokes Woking fit-out completed on programme at week 10. Both wings handed over clean, certified to BS 7671, and signed off by the Entain compliance team. No snagging carryovers. No programme slippage. Woodhouse Contracts reported zero customer complaints throughout the works — the kind of result that builds long-term subcontractor relationships.

Project Tags

RetailCat B Fit-OutLive EnvironmentFTSE100

Get Started

Ready to discuss your project requirements?

🎯

Start Your Project

Free Project Consultation

Discuss your electrical project requirements with our experienced team. No obligation quote.

ctaBook Consultation →
📢

Our Approach

Project Methodology Guide

Learn how we deliver complex electrical projects on time and on budget with our proven process.

campaignLearn More →

Project Details

Status
completed
Scope
Full Fit-Out
Timeline
10 weeks
Location
Woking, Surrey
Capacity
400A TPN
Sector
Retail & Betting

More Commercial Projects

Projects Like This One

Browse our completed commercial electrical installations across the South East — each one delivered to the same standard of documentation, compliance, and programme management.

DHL Reading distribution hub — completed operational facility by Nexgen Electrical Innovations
CommercialCompleted
01 NOV 2025

DHL Reading Distribution Hub

Full Cat B electrical fit-out for DHL's Reading parcel sorting and distribution hub, encompassing conveyor power infrastructure, Schneider LV distribution, office fit-out, and emergency systems across a high-throughput logistics facility.

Reading, Berkshire·Commercial
View Project →
Medivet Watford veterinary practice — completed electrical fit-out by Nexgen Electrical Innovations
CommercialCompleted
01 AUG 2025

Medivet Watford Veterinary Practice

Full electrical fit-out for Medivet's flagship 18,000 sqft Watford veterinary practice — a dual-wing healthcare facility requiring dedicated fuseboards for each wing, healthcare-grade compliance, and precise coordination with Woodhouse Workspace across a live construction programme.

Watford, Hertfordshire·Commercial
View Project →
Biffa Workshop Farnham — 3-phase electrical installation
CommercialCompleted
01 MAY 2026

Biffa Workshop — 3-Phase Electrical Installation

Design and installation of a new fully operational 3-phase electrical supply system for Biffa's workshop facility in Farnham, Surrey — a landmark project that established Nexgen as Biffa's preferred electrical partner.

Farnham, Surrey·Commercial
View Project →
Herschel Grammar School — electrical maintenance contract
CommercialCompleted
04 MAY 2026

Herschel Grammar School — Electrical Maintenance Contract

Exclusive electrical maintenance contract for Herschel Grammar School — a co-educational grammar school with academy status in Slough. From first meeting to ongoing partnership, trust and reliability are the defining pillars of this relationship.

Slough, Berkshire·Commercial
View Project →
Connect With Us

Follow Our Latest Projects

Stay updated with our work across London and the Home Counties. See behind-the-scenes content, project updates, and industry insights.

LinkedInFacebookTwitterInstagram

Interested in a Similar Project?

Whether you're planning an infrastructure upgrade, retrofit, or new installation, our team would love to discuss how we can help.

03333 356 037

Mon-Fri 8am-6pm

projects@nexgen-electrical.co.uk

We reply within 24 hours

Get a QuoteMore Projects
NEXGEN Electrical Innovations

Expert electrical engineering and installations for commercial and industrial frontiers. High-voltage solutions delivered with precision.

From residential EICR compliance and EV charging installations to industrial power systems and 24/7 emergency response — certified UK engineers, built for every scale.

Company

  • About Us
  • Our Team
  • Careers
  • News & Updates
  • Case Studies

Services

  • Residential
  • Commercial
  • Industrial
  • Emergency
  • EV Charging

Support

  • Contact
  • Get a Quote
  • Maintenance Plans
  • FAQs
  • Support Centre

24/7 Emergency

Online

Emergency Response

Always Available

Call Emergency Line
2026 NEXGEN ELECTRICAL INNOVATIONS. ALL RIGHTS RESERVED.
PRIVACY POLICYTERMS OF SERVICELICENSING
POWERED BY ADU-DEV SOLUTIONS